Project No. 1 – Supervision and Commissioning of a Solid Dosage Production Unit

Project No. 1 – Supervision and Commissioning of a Solid Dosage Production Unit

BF Engineering & Consulting supervised the construction and commissioning of a solid dosage production unit, managing all phases from construction to the installation of production equipment and utilities, up to the validation batch.
Learn more

Project No. 2 – Extension of the Purified Water Loop & Optimization of a Syrup Filling Line

Project No. 2 – Extension of the Purified Water Loop & Optimization of a Syrup Filling Line

BF Engineering & Consulting successfully extended the purified water loop to accommodate the expansion of production facilities while ensuring compliance with Good Manufacturing Practices (GMP).
Learn more

Project No. 3 – Optimization of Air Treatment & Extension of the Purified Water Loop

Project No. 3 – Optimization of Air Treatment & Extension of the Purified Water Loop

BF Engineering & Consulting carried out a complete transformation of the air treatment system and an extension of the purified water loop to enhance facility performance and ensure regulatory compliance.
Learn more

Project No. 4 – Development of Process Equipment P&ID & Optimization of the Compressed Air System

Project No. 4 – Development of Process Equipment P&ID & Optimization of the Compressed Air System

BF Engineering & Consulting designed and developed P&ID diagrams for a range of process equipment, ensuring better visualization and control of industrial operations.
Learn more

Project No. 5 – Installation and Commissioning of Production Equipment

Project No. 5 – Installation and Commissioning of Production Equipment

To optimize production capacity, BF Engineering & Consulting managed the installation, commissioning, and qualification of various strategic process, manufacturing, and packaging equipment.
Learn more

Project No. 6 – Transfer of a Macrolide Production Unit

Project No. 6 – Transfer of a Macrolide Production Unit

BF Engineering & Consulting supervised the complete transfer of a macrolide production unit, managing the relocation and installation of essential manufacturing equipment. The project included optimization and validation of all equipment.