Project No. 2 – Extension of the Purified Water Loop & Optimization of a Syrup Filling Line
Project No. 2
Extension of the Purified Water Loop & Optimization of a Syrup Filling Line
BF Engineering & Consulting successfully extended the purified water loop to accommodate the expansion of production facilities while ensuring compliance with Good Manufacturing Practices (GMP).
Work Completed
Extension of the Purified Water Loop
Installation of 280 meters of stainless steel 316L DN 48 piping
Passivation of new pipelines to eliminate contaminants and enhance corrosion resistance
Full qualification: Installation (IQ), Operational (OQ), and Performance (PQ)
P&ID update to reflect the modifications
Optimization of a Syrup Filling Line
Process modifications to improve line efficiency
Increase in Overall Equipment Effectiveness (OEE) from 40% to 60%, enhancing productivity and reducing losses