Project No. 3 – Optimization of Air Treatment & Extension of the Purified Water Loop
Project No. 3
Optimization of Air Treatment & Extension of the Purified Water Loop
BF Engineering & Consulting carried out a complete transformation of the air treatment system and an extension of the purified water loop to enhance facility performance and ensure regulatory compliance.
Work Completed
Air Treatment Optimization
Complete redesign of the air treatment system to improve environmental control and air quality
Full qualification according to regulatory requirements (IQ, OQ, PQ)
Development and update of P&ID (Piping & Instrumentation Diagrams) for optimal traceability
Extension & Optimization of the Purified Water Loop
Expansion of the stainless steel 316L DN 38 network over 120 meters
Implementation of a P3 Oxonia disinfection system to ensure microbiological water quality
Passivation of new pipelines to maintain cleanliness and system durability
Full qualification (IQ, OQ, PQ) to validate system compliance