Project No. 5 – Installation and Commissioning of Production Equipment
Project No. 5
Installation and Commissioning of Production Equipment
To optimize production capacity, BF Engineering & Consulting managed the installation, commissioning, and qualification of various strategic process, manufacturing, and packaging equipment.
Work Completed
Installation & Commissioning of Process Equipment:
High-shear granulator – Ensures a homogeneous blend of powders for solid dosage manufacturing
Film coating turbine – Applies a uniform coating to tablets to enhance protection and controlled release
Commissioning of Packaging Lines:
Packaging line – Optimization of the final product packaging process
Blister packaging line – Implementation and validation of primary packaging environments
Commissioning of Environmental Control & Utility Production Equipment:
Fluidized bed dryer (LAF) – Ensures an even hot air flow for product drying
Distiller – Produces Water for Injection (WFI)
Results & Benefits :
Enhanced efficiency and productivity of production lines
Guaranteed compliance with pharmaceutical standards
Optimized manufacturing conditions in accordance with GMP regulations
Through this intervention, the production unit successfully launched operations with optimized reliability and performance.