BF Engineering & Consulting supervised the complete transfer of a macrolide production unit, managing the relocation and installation of essential manufacturing equipment. The project included optimization and validation of all equipment.
Scope of Work
Transfer & Installation of Production Equipment:
Turbo-sphere – Advanced equipment for mixing, granulation, and drying
Coating unit – Applies protective and stabilizing coatings to pharmaceutical products
Environmental & Utility Control:
Air treatment system – Ensures a clean and controlled environment for optimal and safe production
Purified water generation system – Guarantees compliance with quality standards for pharmaceutical-grade water
Container blender – Ensures uniform mixing of ingredients for consistent product quality
Thanks to BF Engineering & Consulting, the production unit was successfully transferred, enabling operations to resume efficiently while maintaining compliance with GMP standards.